miércoles, 29 de abril de 2015

Budget


Component/Activity
Description
Cost Item
Materials
Stepper Motors
Threaded rod
Stainless steel rod
Resistors
Transistors
Galvanized steel angle
Stainless steel sheet
Nuts
Bolts
Ferric Acid
Milling Drill Bit
Tin Soldier
stainless steel drill bit
$450.00
$300.00
$300.00
$30.00
$60.00
$300.00
$100.00
$54.00
$24.00
$70.00
$83.00
$23.00
$70.00
-       Consumables
Paint
Printouts
Pen
Eraser
$5.00
$50.00
$10.00
$5.00
Bought-in parts
Bearings

$1140.00
Manufacturing
Bushings
$20.00
Equipment buy/hire
Soldering Iron (Hired)
Hammer (Hired)
Circular Saw (Hired)
Drill (Hired)
Screwdriver (Hired)
Arduino (Bought)
Polishing Machine(Hired)
Lathe (Hired)
Press Drill
$0.00
$0.00
$0.00
$0.00
$0.00
$300.00
$0.00
$0.00
$0.00
Travel/ subsistence
Meals
Bus
Gas
Meetings
$300.00
$200.00
$200.00
$150.00


Total costs
$3,489.00

REPORT



My contribution in this second partial. Was the contribution with the construction of the structure of Cartesian Robot, along with its design created in SolidWorks and its respective assembly?
Designing the structure in Solid Works, was not an easy thing. I had to learn and obtain various skills in order to make each of the pieces needed for the structure, correctly. Assembling the Pieces or the axis was the most difficult part of l because we had to be really exact with the measurements and the way we assembled it in order to be able to elaborate an excellent work, and design.
Besides writing the chapter mechanical structure of the dissertation.
With regard to work the teams overall performance, I seemed better organized with my team members, with a much clearer focus, and especially I had more tolerance and friendship with my team members.